Terms and Conditions
1. Parties, acceptance and definitions
1.1 These terms are an agreement between Scout Energy ("Scout", "we", "us"), a business owned and operated by Cedar Solar ("Cedar Solar"), and anyone who registers for, accesses or uses the Scout website at scout.energy and beta.scout.energy, the Scout monitoring hardware, or any Scout report ("you", the "User"). The "Scout Parties" are Scout, Cedar Solar, and their directors, employees, contractors and suppliers.
1.2 By registering, ticking the acceptance box, or using the Service, you confirm that you have read these terms, in particular the notices in sections 4, 5 and 8, and agree to them. If you use the Service on behalf of a company, you confirm that you are authorised to bind it.
1.3 Definitions:
- Service: the Scout website, the beta application, the APIs, the Scout monitors and all reports, charts, simulations and downloads they produce.
- Beta: the current pre-release version of the Service, described in section 2.
- Monitor: a Scout energy monitor with current-transformer (CT) clamps fitted to a site’s electrical supply.
- Readings: the measurements a Monitor sends, as described in section 3.
- Monitoring Report: the monitor page charts, the monitoring PDF and the Intelligent Monitor Report.
- Simulation Report: the simulation page and its PDF, which model a proposed solar PV and battery system against a Monitor’s measured load.
- Installer: a User who uses the Service to advise or quote a third party (a "Client").
- Credits: the prepaid units used to pay for monitoring, described in section 6.
1.4 These terms replace the earlier terms on the site for the Beta. We may change them by publishing a new version; continued use after notice of a change means you accept it.
2. The Beta service
2.1 The Service is a Beta. It is under active development and is offered so that Users can evaluate it and report faults. It is not a finished product.
2.2 During the Beta:
- features, calculations, definitions and report layouts may change, be added or be withdrawn at any time, without notice;
- the same Monitor and period may produce different figures on different pages or on different dates, because known differences between the calculation paths are still being resolved (see section 4.4);
- the Service may be unavailable, slow or interrupted, including for maintenance;
- Readings may be delayed, incomplete, duplicated or wrong;
- data captured during the Beta may be recalculated, reset or deleted.
2.3 We give no service level, uptime or response-time commitment for the Beta.
2.4 Keep your own records. Do not rely on the Service as the only record of a site’s consumption, and do not rely on a Beta report as the only basis for a system design, an investment decision or a quotation.
2.5 Please report faults and unexpected figures to support. We may use your feedback to improve the Service without any obligation to you.
3. Monitors, data and privacy
3.1 Installation is your responsibility. Electricity is dangerous. A Monitor and its CT clamps must be installed and removed only by a qualified, registered electrician, in line with SANS 10142 and all safety requirements. Scout is not liable for installation work, wiring, or damage or injury caused by it.
3.2 What a Monitor sends. For each clamp, at each reading: real power (W), voltage (V), current (A), power factor, frequency (Hz), the Monitor’s own cumulative energy counter (kWh), a timestamp and the Monitor’s serial number. Readings may also be imported from Scout’s earlier system.
3.3 How Readings are stored. Readings are stored per clamp, with the sign the Monitor sent (a clamp fitted the wrong way round reads negative). Scout keeps automatically updated 5-minute and hourly summaries of them, and every figure in the Service is calculated from those summaries.
3.4 Accuracy of Readings depends on the installation. Wrong clamp placement or orientation, unmonitored circuits, a poor Wi-Fi connection or a Monitor moved between sites will make figures wrong or incomplete. Scout cannot detect all of these.
3.5 Personal information. We process account details (name, email, phone, company), site details you enter (site name, town, coordinates), and Readings, which may reveal when a site is occupied. We process them to provide, bill for and improve the Service, as required by POPIA. You confirm that you have the consent or other lawful basis needed to monitor each site, including a Client’s site.
3.6 We do not sell personal information. We share it only with service providers who run the Service for us (hosting, email, payment processing) and when the law requires it. You may ask to access or correct your information, or object to its processing, through support.
4. How the Monitoring Report figures are calculated
This section describes the Beta calculations so you can judge how far to rely on them. All figures are estimates derived from Readings, not a metered, billing-grade or certified measurement.
4.1 Inputs and units
- Power is the Monitor’s reported real power (kW), never apparent power (kVA). Energy is in kWh.
- Each clamp’s power is treated as a magnitude (made positive), so a reversed clamp still counts as load. Export to the grid therefore cannot be told apart from import.
- Times are grouped by South African Standard Time (UTC+2), except as noted in 4.3.
4.2 Monitor page and monitoring PDF (calculated on Scout’s server)
| Figure | How it is calculated |
|---|---|
| Time step | 5 minutes for windows up to 2 days, 1 hour up to 31 days, 1 day up to 800 days |
| Total load | Sum of the clamps’ average power in each time step |
| Energy (kWh) | The power curve integrated over time, carrying each reading forward until the next one. It does not use the Monitor’s own kWh counter, because Monitors are moved between sites |
| Peak demand | For each time step, the sum of each clamp’s highest reading in that step. The clamps may not have peaked at the same moment, so this is an upper bound, and it can read higher at a coarser time step |
| Daily peak | The highest peak on each local calendar day |
| Day / night split | Energy by local hour of day |
| Missing data | A time step with no Reading is shown as a gap and excluded from averages, never as zero load |
4.3 Intelligent Monitor Report (calculated in your web browser from the same data)
- Totals, daily energy and daily peaks use the time step chosen for the period (see 4.2).
- Hour-of-day figures (weekly profile, weekday/weekend profile, day/night split, 6-hour blocks, demand bands) always use hourly data and cover only the most recent 31 days of a longer period.
- The day window defaults to 06:00–18:00 and can be changed. Hours are read in your browser’s time zone.
- Demand bands split 0 kW to the peak into four equal bands and show the share of time and of energy in each.
- Average day = total energy ÷ number of days with any data.
- When several Monitors are combined, their totals are added together time step by time step.
4.4 Known limitations in the Beta (found in internal testing on 15 October 2026 and being fixed)
- Peak demand on the Monitoring Report can read up to about 20% above the true combined peak, because clamp maxima are added together (4.2).
- In hourly and daily data, an hour with only some Readings can be counted as a full hour, which raised 28-day totals by 0.2%–1.4% in testing and individual hours by much more.
- On small loads whose readings change sign, energy can differ by up to about 14% depending on the time step used.
- The Monitoring Report and the Simulation Report use different time steps, peak definitions, day windows and rules for incomplete days, so their figures for the same Monitor and period will not match exactly.
4.5 Coverage figures show the share of expected data that was received. Low coverage means the figures are less reliable.
5. How the Simulation Report works
The Simulation Report is a high-level indication of how a proposed solar PV and battery system might have performed against a Monitor’s measured load. It is not a system design, a yield guarantee or a financial forecast.
5.1 Inputs
| Input | Default | Shown |
|---|---|---|
| Monitor and period | none, up to 31 days | always |
| Inverter rating (kW) | 100 | always |
| Battery nominal capacity (kWh) | 300 | always |
| PV array (kWp) | 200 | always |
| Solar site | Johannesburg (or Cape Town) | Advanced settings |
| Solar month | Annual average (or the lowest-sun month, or one month) | Advanced settings |
| Panel tilt | Site default: 26° Johannesburg, 30° Cape Town | Advanced settings |
| Panel azimuth | 0° (north) | Advanced settings |
| PV system losses | 20% | Advanced settings |
| Battery depth of discharge | 80% | Advanced settings |
| Battery round-trip efficiency | 92%, fixed | not shown |
5.2 Measured load
- Real power from the Monitor at 5-minute steps, all clamps added together (section 4.1).
- Only complete days (at least 90% of 5-minute steps received) are used for the averages. If no day is complete, all days are used, which understates the load.
- The average day is the mean of each hour across the complete days. The average week is the same per weekday.
5.3 Solar model
- Monthly global horizontal irradiation for each site comes from PV*SOL premium 2018 (Meteonorm, 1991–2010).
- It is turned into an hourly profile for a representative day of each month and projected onto the panel plane using standard published methods (Collares-Pereira & Rabl, Erbs diffuse fraction, isotropic sky, 20% ground reflectance).
- PV output each hour = array kWp × plane-of-array irradiation × (1 − losses).
- In a test against PV*SOL for a 130 kWp system, annual yield was within −2.4% (Johannesburg) and +0.1% (Cape Town); individual months differed by up to about 17%.
- Only two sites exist. A site elsewhere is modelled with the nearest one’s sun, which may be materially wrong.
5.4 Energy flow, hour by hour
- PV supplies the load first.
- Only PV left over charges the battery, up to its usable capacity (nominal × depth of discharge), with 8% lost on charging.
- PV that still cannot be used is counted as unused. It is not valued as export.
- Any remaining load is supplied by the battery, then by the grid.
- The grid never charges the battery.
- The model does not limit power by the inverter rating or by a battery charge/discharge rate. A real system will be limited by both.
- The day is repeated until the battery’s charge settles, so results do not depend on an assumed starting charge.
5.5 What the report shows
- Headline figures (daily PV, grid draw, self-sufficiency) come from the average day. On sites with very different weekdays and weekends this overstated self-sufficiency by 6–10 percentage points in testing compared with the weekly result.
- Month by month: the average day run against each month’s average sun.
- Battery state of charge on the average day and on the highest night-load and lowest-consumption days.
- Inverter operating capacity: the share of 5-minute steps in which the measured load fell into each band of the inverter rating. Short starting peaks inside a 5-minute step are not visible.
- Battery runtime: usable capacity × √(round-trip efficiency) ÷ the upper edge of each demand band.
- Day/night split using a fixed 08:00–17:00 day window.
5.6 What the model does not account for, among other things: weather variation between years, shading, soiling beyond the loss factor, panel degradation, inverter and battery limits and efficiency curves, battery ageing, grid outages and load shedding, tariffs, feed-in rules and payback, changes in the site’s future load, and the electrical, structural and regulatory requirements of a real installation.
5.7 Every proposal or quotation to a Client must be designed, checked and signed off by a suitably qualified person using their own professional judgement and tools.
6. Credits, billing and access to data
6.1 Monitoring is paid for with prepaid Credits, bought through the site. Prices are shown at checkout and may change without notice; they include VAT where stated.
6.2 How Credits are used. One Credit is used per Monitor for each 6-hour window in which that Monitor reported at least one Reading. Windows are fixed blocks counted from midnight UTC (02:00, 08:00, 14:00 and 20:00 SAST). A window is charged in full or not at all; there is no part-window charge.
6.3 Billing happens after use. Windows are charged after they close, normally within a few hours. A Monitor that keeps reporting after your Credits run out keeps being charged, and your balance goes negative (arrears).
6.4 Unpaid data is hidden. While your account is in arrears, charts, reports and simulations stop at the oldest unpaid window. Buying Credits pays off the oldest arrears first, and the hidden data becomes visible again once the debt is cleared. Credits are shared by all Monitors on your company account.
6.5 Stopping charges. Setting a Monitor to inactive stops charges from that moment. It does not refund windows already used, and the window in which you switched it off is charged in full.
6.6 The Credits on your account are the record of what you owe and have paid. Credits are not money, cannot be exchanged for cash, and are not refundable except where the law requires.
7. No professional advice; your responsibilities
7.1 The Service is a tool that supports professional judgement. It is not engineering, electrical, financial, tax or legal advice, and it does not replace a site survey or a system design.
7.2 You are solely responsible for:
- checking that the Monitor was installed correctly and that the data covers the period and circuits you need;
- checking every figure before you rely on it or pass it on;
- the design, sizing, component selection, compliance (including SANS 10142-1, SSEG registration with the municipality or Eskom, and NRS 097) and safety of any system you propose or install;
- every quotation, performance or savings statement you give a Client.
7.3 Installers and Clients. If you share a Monitoring or Simulation Report with a Client, you must present it as an indicative estimate and tell the Client about the limits in sections 4 and 5. You may not represent a Scout figure as a guarantee. Scout has no contract with, and no duty of care to, your Clients.
7.4 You must not misuse the Service: no access to another company’s data, no reverse engineering, scraping or overloading the Service, no unlawful monitoring, and no sharing your login.
8. Disclaimers, limitation of liability and indemnity
8.1 As is. To the extent the law allows, the Service and every Reading, figure, report and simulation are provided "as is" and "as available", without any warranty, express or implied, including warranties of accuracy, completeness, availability, fitness for purpose or that the Service is free of errors or harmful code.
8.2 No liability for reliance. To the extent the law allows, the Scout Parties (including Cedar Solar) are not liable for any loss or damage arising from:
- use of, or inability to use, the Service;
- any inaccuracy, gap, delay, difference or loss of Readings or figures, including the limitations disclosed in sections 4 and 5;
- any system design, purchase, installation, quotation, savings or performance claim, or financing decision made using the Service;
- installation, removal or operation of a Monitor;
- a Client’s or other third party’s claims against you;
- interruption, data reset or deletion, unauthorised access or causes beyond our reasonable control;
whether in contract, delict or otherwise, and including indirect, special or consequential loss, loss of profit, revenue, savings, data, goodwill or business.
8.3 Cap. If any Scout Party is found liable despite 8.1 and 8.2, the combined total liability of all Scout Parties for all claims is limited to the fees you paid Scout in the 12 months before the claim arose, or R1,000 if you paid nothing.
8.4 What is not excluded. Nothing in these terms excludes or limits liability for gross negligence, fraud or wilful misconduct, or any right a consumer has under the CPA or other law that cannot be excluded. Where the law limits an exclusion, it applies to the maximum extent allowed.
8.5 Indemnity. You indemnify and hold harmless the Scout Parties, including Cedar Solar, against all claims, losses, damages and costs (including attorney-and-client costs) arising from: your breach of these terms; your use of the Service or its output for a Client; any system you design, quote or install; any Monitor installation you arrange; and any claim by a Client or third party relating to these.
8.6 Time limit. To the extent the law allows, a claim against any Scout Party must be notified to Scout in writing within 6 months of the event giving rise to it.
9. General
9.1 Intellectual property. The Service, its software, calculations, reports and branding belong to Scout and Cedar Solar. You may use reports for your own business and share them with your Clients under section 7.3. You own your account data and Readings; you give Scout a licence to use them to run and improve the Service, and to use anonymised, aggregated data for any purpose.
9.2 Suspension and termination. We may suspend or close an account that breaches these terms or is in arrears. You may close your account at any time; Credits used and arrears remain payable.
9.3 Third-party links and services are used at your own risk.
9.4 Governing law. These terms are governed by the law of the Republic of South Africa, and the South African courts have jurisdiction.
9.5 Whole agreement and severability. These terms are the whole agreement about the Service. If a provision is invalid, the rest still applies, and the invalid provision applies to the extent the law allows. A failure to enforce a term is not a waiver of it.
9.6 Notices and contact. Notices to Scout go to the support address on the site; notices to you go to your account email.
